Service Hotline:
0510-88700553/88707301
We use the process must pay attention to the operation of the person must follow the following operation flow, to the correct operation of the coating machine. In order to avoid damage to the coating machine, resulting in failure can not work properly.
1, you must first turn on the main power to the control cabinet through the power, then the hands to control the barrel up button, so that the coating machine running to ninety degrees feeding position.
2, the use of traffic, according to the different needs of the process of different feeding operation.
3, with both hands to control the barrel down button, so that the coating barrel to twenty-five degrees to cover the location, and start the coating machine rotation button, so that the coating barrel began to rotate work.
4. Set the temperature of the coating machine heating to control the temperature of the inner wall of the coating barrel to be less than or equal to sixty-five degrees Celsius, and start cutting heating to heat the coating barrel.
5, in accordance with the provisions of the process, adding additives, insulation coating work.
6, until all the powder is dried, to turn off the heating power, the hands of the barrel to control the button down, so that the coating bucket to run to 320 degrees unloading discharge position, when unloading Must also maintain the rotation of the coated bucket.
7, wait until the barrel wall temperature is less than or equal to forty degrees Celsius, you can stop the barrel rotation, and cut off the main power to wait for the next operation.
Copyright ◎ 2016 yudajixie.com Wuxi Yuda Light Industry Machinery Factory All rights reserved suICP12031851suICP12031851